Consultation information
Detailed information
Project description
A summary description of the North London Heat and Power Project including the nature of the development proposed and key features of the development.
Read more
Construction
A summary of the planned construction and demolition works required for the project and the approach to the Code of Construction Practice being adopted.
Read more
EIA process
Sets out the issues which are expected to be considered as part of the environmental impact assessment which will be carried out to allow us to prepare the environmental statement.
Read more
Planning Policy
A summary of the relevant planning policy documents at a national, regional and local level, and provides links to the policies.
Read more
Transport
A summary of the process for assessing traffic impacts of the North London Heat and Power Project.
Read more
LondonWaste Limited
Explains the nature of the company and sets out the waste management services provided by the company to North London Waste Authority.
Read more
Tell me more about landfill
Explain how landfill sites operate, why they are used for disposing of north London’s waste now, how much they cost and why we no longer want to use them.
Read more
Options
A summary of the alternative plans and proposals North London Waste Authority considered prior to embarking on the North London Heat and Power Project.
Read more
Cooling system
Explains the difference between an air cooled condenser system and a water cooling system for an Energy Recovery Facility.
Read more
Waste Modelling
Summarises the results and methodology for calculating waste projections to inform the sizing of the proposed Energy Recovery Facility.
Read more
Water Transport
A summary of North London Waste Authority’s investigations into the possibility of transporting via water, waste to and Incineration Bottom Ash from the Edmonton Ecopark.
Read more
Health and emissions
A summary of the atmospheric emissions from a modern energy from waste facility and how they are controlled and their impact on human health.
Read more
What is EfW
Explains the difference between an Energy from Waste plant and an Energy Recovery Facility.
Read more
The waste challenge
A summary of the challenges facing North London Waste Authority as the second largest waste authority in the country and our plans for managing the waste.
Read more
Further reading
North London Joint Waste Strategy
Strategy document that outlines what we’re doing now to manage waste in north London and how we plan to manage it in the future.
Read more
Waste Prevention Plan 2014-16
Plan which sets out how the waste prevention objectives in the North London Joint Waste Strategy will be met 2014-16.
Read more
Eunomia waste data report and Waste Forecast Model
Technical report summarising the methodology and results of waste forecasting modelling to identify future waste management requirements with a technical spreadsheet model.
Read more
Outline Business Case
Outlines the business case for North London Waste Authority’s previous procurement strategy.
Read more
Ramboll report: A Review of Thermal Treatment Options
A review of thermal treatment technology options and sets out the rationale for the technology proposed.
Read more
Ramboll report: Design of Plant, Number of Plant Lines
Design concepts and options for the replacement Energy Recovery Facility at the Edmonton EcoPark.
Read more
Site Boundary Plan
The outline of the EcoPark site where the majority of the development proposed in the North London Heat and Power Project will take place.
Read more
Project Glossary
Acronyms and defined terms that are used throughout the Development Consent Order application documents.
Read more
Amec Factual Geotechnical Ground Investigation Report
This report provides an assessment of the ground conditions where North London Waste Authority is proposing to build the replacement facility.
Read more
EIA Scoping report
Sets out the proposed scope of the Environmental Statement to be submitted with the application for the Development Consent Order.
Read more
Ramboll report: Health Impact Literature Review
A review of a number of publicly available studies considering the potential health impacts of existing Energy from Waste and Energy Recovery Facilities.
Read more
Ramboll report: Flue Gas Treatment Technology Options
A review of available Energy Recovery Facility flue gas treatment technology options and their respective performance levels.
Read more
Ramboll report: Cooling Plant Technology Options
A review of Energy Recovery Facility cooling plant technology options and their relative merits.
Read more
List of consultees
A list that sets outs the categories of people that North London Waste Authority is required to consult.
Read more
Statement of Community Consultation
Sets out how North London Waste Authority will consult on the North London Heat and Power Project.
Read more
Vicinity Plan
A map of the part of north London in the vicinity of the EcoPark site showing:
1. The EcoPark site
2. 1.5km radius from the EcoPark site
3. The consultation zone boundary
Read more
Planning policies
National Policy Statement for Energy (EN1)
Provides the basis for decisions by the Planning Inspectorate on applications for new nationally significant energy infrastructure.
https://www.gov.uk/government/publications/national-policy-statements-for-energy-infrastructure
National Policy Statement forRenewable Energy Infrastructure (EN3)
Provides the basis for decisions by the Planning Inspectorate on applications for new nationally significant renewable energy infrastructure.
https://www.gov.uk/government/publications/national-policy-statements-for-energy-infrastructure
National Planning Policy Framework
Guidance for local planning authorities and decision-takers in drawing up plans and making decisions about planning applications.
https://www.gov.uk/government/publications/national-planning-policy-framework--2
Mayor’s Strategies for Waste
London Mayor’s vision to become a world leader in waste management, making use of innovative techniques and technologies to minimise the impact of waste.
http://www.london.gov.uk/priorities/environment/publications/the-mayors-waste-management-strategies
Climate Change and Energy
London Mayor’s climate change adaptation strategy and climate change mitigation and energy strategy for London.
http://www.london.gov.uk/priorities/environment/publications/managing-risks-and-increasing-resilience-the-mayor-s-climate
London Plan
The spatial development strategy for London setting out a fully integrated economic, environmental, transport and social framework for the development of the capital to 2031.
http://www.london.gov.uk/priorities/planning/london-plan
Upper Lee Valley Opportunity Area Planning Framework (ULVOAF)
Framework for the regeneration of the Upper Lee Valley, Supplementary Planning Guidance to the London Plan and will be used as a material consideration in the determination of planning applications.
https://www.london.gov.uk/priorities/planning/opportunity-areas/upper-lee-valley-opportunity-area-planning-framework-0
Enfield Local Plan
Set of planning policies that are used to determine planning applications in Enfield.
http://www.enfield.gov.uk/info/1000000456/local_plan_planning_policy
Central Leeside Area Action Plan
Provides the specific planning allocations and designations for the Central Leeside area, which includes the Edmonton EcoPark site.
http://www.enfield.gov.uk/info/1000000456/local_plan_planning_policy/501/central_leeside__area_action_plan
Edmonton EcoPark Planning Brief Supplementary Planning Document (SPD)
A supplementary Planning Document to Enfield’s Local Plan. The Planning Brief provides guidance on the future development of the EcoPark.
http://www.enfield.gov.uk/info/1000000664/edmonton_regeneration/2249/edmonton_ecopark_planning_brief_supplementary_planning_document_spd