Consultations are closed

If you have any questions please call 0208 489 3940 or email info@northlondonheatandpower.london

Preliminary Environmental Information Report

Appendices Figures

Vol 1 Figure 2.1 Application Site Boundary and Site Context
Vol 1 Figure 2.2 Environmental Designations
Vol 1 Figure 3.1 Detailed Site Layout
Vol 1 Figure 3.2 Phasing Plan - Phase 1a
Vol 1 Figure 3.3 Phasing Plan - Phase 1b
Vol 1 Figure 3.4 Phasing Plan - Phase 1c
Vol 1 Figure 3.5 Phasing Plan - Phase 1d
Vol 1 Figure 3.6 Phasing Plan - Phase 2
Vol 1 Figure 3.7 Phasing Plan - Phase 3
Vol 1 Figure 3.8 Phasing Plan - Phase 4
Vol 1 Figure 5.1 Cumulative Development Location Plan

Vol 2 Figure 2.1 AQMA
Vol 2 Figure 2.2 Monitoring Locations
Vol 2 Figure 2.3 Arup Monitoring Locations
Vol 2 Figure 2.4 Odour Complaints
Vol 2 Figure 2.5 Construction Dust Buffers
Vol 2 Figure 2.6 Receptor Locations
Vol 2 Figure 2.7 Model Output Grid
Vol 2 Figure 2.8 Ecological Receptors
Vol 2 Figure 2.9 Human Health Receptors
Vol 2 Figure 2.10 Wind Rose
Vol 2 Figure 2.11 Modelled Buildings
Vol 2 Figure 2.12 Existing EfW NO2
Vol 2 Figure 2.13 Existing EfW PM10
Vol 2 Figure 2.14 ERF Wet FGT NO2
Vol 2 Figure 2.15 ERF Wet FGT PM10
Vol 2 Figure 2.16 ERF Wet with reheat FGT NO2
Vol 2 Figure 2.17 ERF Wet with reheat FGT PM10
Vol 2 Figure 6.1 Borehole Plan
Vol 2 Figure 6.2 Section A-A
Vol 2 Figure 6.3 Section B-B
Vol 2 Figure 6.4 Source Protection Zone
Vol 2 Figure 6.5 London Clay Thickness
Vol 2 Figure 7.1 Noise Measurement and Receptor Locations
Vol 2 Figure 7.2 Traffic Routes for NLHPP
Vol 2 Figure 8.1 Neighbourhood Area
Vol 2 Figure 8.2 Deprivation in Neighbourhood
Vol 2 Figure 9.1 Local Highway Network
Vol 2 Figure 9.2 Local Transport Context
Vol 2 Figure 10.1 Hydrology
Vol 2 Figure 10.2 Abstractions and Discharges

Hello! Our two planned phases of consultation have now finished. We have reviewed all of the feedback we received during both phases of the consultation and have produced a summary of the consultation report.