Phase 2 Consultation Documents
Air Quality - signpost to documents
Air quality is addressed in a number of studies. This document summarises those studies and provides links to where you can find further information.
Read more
Composting
Describes the current and future arrangements for composting organic waste made up of kitchen and garden wastes collected by the seven north London boroughs. It also explains NLWA’s intention to continue to provide free compost to local residents and boroughs in the future.
Read more
Construction updated from phase 1
A summary of the planned construction and demolition works required for the project and the approach to the Code of Construction Practice being adopted.
Read more
Cooling System updated from phase 1
Explains the difference between an air cooled condenser system and a water cooling system for an Energy Recovery Facility.
Read more
Design Statement Overview
Provides an overview of the design principles which have informed the Project and provides a more detailed description of the overall design.
Read more
Development Consent Order - what will it include?
A description of the development consent order sought by NLWA including the structure and content of the document and its key components.
Read more
EIA Process and PEIR updated from phase 1
Sets out the issues which are expected to be considered as part of the environmental impact assessment which will be carried out to allow us to prepare the environmental statement.
Read more
ERF Air Quality Emissions
Sets out the emissions reductions which are expected to be achieved by the proposed Energy Recovery Facility.
Read more
Health and emissions
A summary of the atmospheric emissions from a modern energy from waste facility and how they are controlled and their impact on human health.
Read more
LondonWaste Limited
Explains the nature of the company and sets out the waste management services provided by the company to North London Waste Authority.
Read more
Options - Updated from Phase 1
A summary of the alternative plans and proposals NLWA considered prior to embarking on the Project.
Read more
Planning Policy
A summary of the relevant planning policy documents at a national, regional and local level, and provides links to the policies.
Read more
Project Description updated from phase 1
A summary description of the Project including the nature of the development proposed and key features of the development.
Read more
Site Management Issues
Explains the process for ensuring effective control of potential pollution and nuisances associated with waste management sites.
Read more
Sustainable Design Strategy
Summarises the approach to sustainability performance of the Project and outlines measures incorporated into the design to enhance sustainability.
Read more
Tell me more about landfill
Explain how landfill sites operate, why they are used for disposing of north London’s waste now, how much they cost and why we no longer want to use them.
Read more
Transport updated from phase 1
A summary of the process for assessing traffic impacts of the Project.
Read more
The waste challenge updated from phase 1
A summary of the challenges facing NLWA as the second largest waste authority in the country and our plans for managing the waste.
Read more
Waste Modelling updated from phase 1
Summarises the results and methodology for calculating waste projections to inform the sizing of the proposed Energy Recovery Facility.
Read more
Water Transport updated from phase 1
A summary of NLWA’s investigations into the possibility of using water transport to move waste to the Edmonton EcoPark and incineration bottom ash away from the site for disposal.
Read more
What is EfW
Explains the difference between an Energy from Waste plant and an Energy Recovery Facility.
Read more
Feedback Form
You can download and print a copy of our feedback form so you can complete it by hand and post it to us.
Read more
Further reading
Statement of Community Consultation
Sets out how NLWA will consult on the Project.
Read more
List of consultees
A spreadsheet that sets outs the categories of people that NLWA is consulting.
Read more
Vicinity Plan
A map of the part of north London in the vicinity of the EcoPark site showing:
1. The EcoPark site
2. 1.5km radius from the EcoPark site
3. The consultation zone boundary
Read more
Phase 1 Consultation Feedback Report
Sets out the process undertaken for the first phase of consultation, the feedback received and our proposed response.
Read more
Project Glossary
Acronyms and defined terms that are used throughout the Development Consent Order application documents.
Read more
Book of Plans
A set of drawings which show what NLWA is seeking consent for.
Read more
Site Boundary Plan
The outline of the EcoPark site where the majority of the development proposed in the North London Heat and Power Project will take place.
Read more
Design Statement
Provides information on the design approach to the Project, including the design aims and objectives. It also includes the principles for design.
Read more
Waste Data Report and Waste Forecast Model
Technical report summarising the methodology and results of waste forecasting modelling to identify future waste management requirements with a technical spreadsheet model.
Read more
A Review of Thermal Treatment Options
A review of thermal treatment technology options and sets out the rationale for the technology proposed.
Read more
Design of Plant - Number of Plant Lines
Design concepts and options for the replacement Energy Recovery Facility at the Edmonton EcoPark.
Read more
Health Impact Literature Review
A review of a number of publicly available studies considering the potential health impacts of existing Energy from Waste and Energy Recovery Facilities.
Read more
Flue Gas Treatment Technology Options Report
A review of available Energy Recovery Facility flue gas treatment technology options and their respective performance levels.
Read more
Cooling Plant Technology Options Report
A review of Energy Recovery Facility cooling plant technology options and their relative merits.
Read more
Factual Geotechnical Ground Investigation Report
Provides an assessment of the ground conditions where NLWA is proposing to build the replacement facility.
Read more
EIA Scoping report
Sets out the proposed scope of the Environmental Statement to be submitted with the application for the Development Consent Order.
Read more
Preliminary Environmental Information Report (PEIR)
Provides preliminary environmental information on the likely significant effects of the Project.
Read more
Interim Screening Statement to Inform a Habitats Regulations Assessment
Statement to inform a Habitats Regulations Assessment for the Project.
Read more
Interim Health Impact Assessment
Qualitatively assesses the potential health impacts of the Project and its influence on factors relating to health.
Read more
Interim Report on Natural Features
Sets out an assessment of any effects on natural features likely to be caused by the Project.
Read more
Interim Need Assessment
Provides an assessment of the need for the Project in respect of energy generation and waste management.
Read more
Interim Alternative Assessment Report
Assesses the historic and strategic development of technology and site options for the Project.
Read more
Interim Waste Fuel Management Assessment
Sets out how waste received onto the EcoPark site will be managed.
Read more
Interim Transport Report
Sets out an assessment of the potential transport impacts of the Project.
Read more
Interim Code of Construction Practice
Sets out how construction of the Project, including demolition of the existing Energy from Waste facility, will be managed to minimise disruption.
Read more
Interim Combined Heat and Power Strategy
Describes the opportunity for the Project to provide Combined Heat and Power (CHP) and how this will be addressed in the proposals.
Read more
North London Joint Waste Strategy
Outlines what we’re doing now to manage waste in north London and how we plan to manage it in the future.
Read more
Waste Prevention Plan 2014-16
Sets out how the waste prevention objectives in the North London Joint Waste Strategy will be met 2014-16.
Read more
Outline Business Case 2010
Outlines the business case for NLWA’s previous procurement strategy.
Read more
Planning policies
National Policy Statement for Energy (EN1)
Provides the basis for decisions by the Planning Inspectorate on applications for new nationally significant energy infrastructure.
https://www.gov.uk/government/publications/national-policy-statements-for-energy-infrastructure
National Policy Statement forRenewable Energy Infrastructure (EN3)
Provides the basis for decisions by the Planning Inspectorate on applications for new nationally significant renewable energy infrastructure.
https://www.gov.uk/government/publications/national-policy-statements-for-energy-infrastructure
National Planning Policy Framework
Guidance for local planning authorities and decision-takers in drawing up plans and making decisions about planning applications.
https://www.gov.uk/government/publications/national-planning-policy-framework--2
Mayor’s Strategies for Waste
London Mayor’s vision to become a world leader in waste management, making use of innovative techniques and technologies to minimise the impact of waste.
http://www.london.gov.uk/priorities/environment/publications/the-mayors-waste-management-strategies
Climate Change and Energy
London Mayor’s climate change adaptation strategy and climate change mitigation and energy strategy for London.
http://www.london.gov.uk/priorities/environment/publications/managing-risks-and-increasing-resilience-the-mayor-s-climate
London Plan
The spatial development strategy for London setting out a fully integrated economic, environmental, transport and social framework for the development of the capital to 2031.
http://www.london.gov.uk/priorities/planning/london-plan
Upper Lee Valley Opportunity Area Planning Framework (ULVOAF)
Framework for the regeneration of the Upper Lee Valley, Supplementary Planning Guidance to the London Plan and will be used as a material consideration in the determination of planning applications.
https://www.london.gov.uk/priorities/planning/opportunity-areas/upper-lee-valley-opportunity-area-planning-framework-0
Enfield Local Plan
Set of planning policies that are used to determine planning applications in Enfield.
http://www.enfield.gov.uk/info/1000000456/local_plan_planning_policy
Central Leeside Area Action Plan
Provides the specific planning allocations and designations for the Central Leeside area, which includes the Edmonton EcoPark site.
http://www.enfield.gov.uk/info/1000000456/local_plan_planning_policy/501/central_leeside__area_action_plan
Edmonton EcoPark Planning Brief Supplementary Planning Document (SPD)
A supplementary Planning Document to Enfield’s Local Plan. The Planning Brief provides guidance on the future development of the EcoPark.
http://www.enfield.gov.uk/info/1000000664/edmonton_regeneration/2249/edmonton_ecopark_planning_brief_supplementary_planning_document_spd