Document Library

Phase 2 Consultation Documents

Air Quality - signpost to documents

Air quality is addressed in a number of studies. This document summarises those studies and provides links to where you can find further information.
Read more

Composting

Describes the current and future arrangements for composting organic waste made up of kitchen and garden wastes collected by the seven north London boroughs. It also explains NLWA’s intention to continue to provide free compost to local residents and boroughs in the future.
Read more

Construction updated from phase 1

A summary of the planned construction and demolition works required for the project and the approach to the Code of Construction Practice being adopted.
Read more

Cooling System updated from phase 1

Explains the difference between an air cooled condenser system and a water cooling system for an Energy Recovery Facility.
Read more

Design Statement Overview

Provides an overview of the design principles which have informed the Project and provides a more detailed description of the overall design.
Read more

Development Consent Order - what will it include?

A description of the development consent order sought by NLWA including the structure and content of the document and its key components.
Read more

EIA Process and PEIR updated from phase 1

Sets out the issues which are expected to be considered as part of the environmental impact assessment which will be carried out to allow us to prepare the environmental statement.
Read more

ERF Air Quality Emissions

Sets out the emissions reductions which are expected to be achieved by the proposed Energy Recovery Facility.
Read more

Health and emissions

A summary of the atmospheric emissions from a modern energy from waste facility and how they are controlled and their impact on human health.
Read more

LondonWaste Limited

Explains the nature of the company and sets out the waste management services provided by the company to North London Waste Authority.
Read more

Options - Updated from Phase 1

A summary of the alternative plans and proposals NLWA considered prior to embarking on the Project.
Read more

Planning Policy

A summary of the relevant planning policy documents at a national, regional and local level, and provides links to the policies.
Read more

Project Description updated from phase 1

A summary description of the Project including the nature of the development proposed and key features of the development.
Read more

Site Management Issues

Explains the process for ensuring effective control of potential pollution and nuisances associated with waste management sites.
Read more

Sustainable Design Strategy

Summarises the approach to sustainability performance of the Project and outlines measures incorporated into the design to enhance sustainability.
Read more

Tell me more about landfill

Explain how landfill sites operate, why they are used for disposing of north London’s waste now, how much they cost and why we no longer want to use them.
Read more

Transport updated from phase 1

A summary of the process for assessing traffic impacts of the Project.
Read more

The waste challenge updated from phase 1

A summary of the challenges facing NLWA as the second largest waste authority in the country and our plans for managing the waste.
Read more

Waste Modelling updated from phase 1

Summarises the results and methodology for calculating waste projections to inform the sizing of the proposed Energy Recovery Facility.
Read more

Water Transport updated from phase 1

A summary of NLWA’s investigations into the possibility of using water transport to move waste to the Edmonton EcoPark and incineration bottom ash away from the site for disposal.
Read more

What is EfW

Explains the difference between an Energy from Waste plant and an Energy Recovery Facility.
Read more

Feedback Form

You can download and print a copy of our feedback form so you can complete it by hand and post it to us.
Read more

Further reading

Statement of Community Consultation

Sets out how NLWA will consult on the Project.
Read more

List of consultees

A spreadsheet that sets outs the categories of people that NLWA is consulting.
Read more

Vicinity Plan

A map of the part of north London in the vicinity of the EcoPark site showing: 

1. The EcoPark site 
2. 1.5km radius from the EcoPark site 
3. The consultation zone boundary
Read more

Phase 1 Consultation Feedback Report

Sets out the process undertaken for the first phase of consultation, the feedback received and our proposed response.
Read more

Project Glossary

Acronyms and defined terms that are used throughout the Development Consent Order application documents.
Read more

Book of Plans

A set of drawings which show what NLWA is seeking consent for.
Read more

Site Boundary Plan

The outline of the EcoPark site where the majority of the development proposed in the North London Heat and Power Project will take place.
Read more

Design Statement

Provides information on the design approach to the Project, including the design aims and objectives. It also includes the principles for design.
Read more

Waste Data Report and Waste Forecast Model

Technical report summarising the methodology and results of waste forecasting modelling to identify future waste management requirements with a technical spreadsheet model.
Read more

A Review of Thermal Treatment Options

A review of thermal treatment technology options and sets out the rationale for the technology proposed.
Read more

Design of Plant - Number of Plant Lines

Design concepts and options for the replacement Energy Recovery Facility at the Edmonton EcoPark.
Read more

Health Impact Literature Review

A review of a number of publicly available studies considering the potential health impacts of existing Energy from Waste and Energy Recovery Facilities.
Read more

Flue Gas Treatment Technology Options Report

A review of available Energy Recovery Facility flue gas treatment technology options and their respective performance levels.
Read more

Cooling Plant Technology Options Report

A review of Energy Recovery Facility cooling plant technology options and their relative merits.
Read more

Factual Geotechnical Ground Investigation Report

Provides an assessment of the ground conditions where NLWA is proposing to build the replacement facility.
Read more

EIA Scoping report

Sets out the proposed scope of the Environmental Statement to be submitted with the application for the Development Consent Order.
Read more

Preliminary Environmental Information Report (PEIR)

Provides preliminary environmental information on the likely significant effects of the Project.
Read more

Interim Screening Statement to Inform a Habitats Regulations Assessment

Statement to inform a Habitats Regulations Assessment for the Project.
Read more

Interim Health Impact Assessment

Qualitatively assesses the potential health impacts of the Project and its influence on factors relating to health.
Read more

Interim Report on Natural Features

Sets out an assessment of any effects on natural features likely to be caused by the Project.
Read more

Interim Need Assessment

Provides an assessment of the need for the Project in respect of energy generation and waste management.
Read more

Interim Alternative Assessment Report

Assesses the historic and strategic development of technology and site options for the Project.
Read more

Interim Waste Fuel Management Assessment

Sets out how waste received onto the EcoPark site will be managed.
Read more

Interim Transport Report

Sets out an assessment of the potential transport impacts of the Project.
Read more

Interim Code of Construction Practice

Sets out how construction of the Project, including demolition of the existing Energy from Waste facility, will be managed to minimise disruption.
Read more

Interim Combined Heat and Power Strategy

Describes the opportunity for the Project to provide Combined Heat and Power (CHP) and how this will be addressed in the proposals.
Read more

North London Joint Waste Strategy

Outlines what we’re doing now to manage waste in north London and how we plan to manage it in the future.
Read more

Waste Prevention Plan 2014-16

Sets out how the waste prevention objectives in the North London Joint Waste Strategy will be met 2014-16.
Read more

Outline Business Case 2010

Outlines the business case for NLWA’s previous procurement strategy.
Read more

Planning policies

National Policy Statement for Energy (EN1)

Provides the basis for decisions by the Planning Inspectorate on applications for new nationally significant energy infrastructure.
https://www.gov.uk/government/publications/national-policy-statements-for-energy-infrastructure

National Policy Statement forRenewable Energy Infrastructure (EN3)

Provides the basis for decisions by the Planning Inspectorate on applications for new nationally significant renewable energy infrastructure.
https://www.gov.uk/government/publications/national-policy-statements-for-energy-infrastructure

National Planning Policy Framework

Guidance for local planning authorities and decision-takers in drawing up plans and making decisions about planning applications.
https://www.gov.uk/government/publications/national-planning-policy-framework--2

Mayor’s Strategies for Waste

London Mayor’s vision to become a world leader in waste management, making use of innovative techniques and technologies to minimise the impact of waste.
http://www.london.gov.uk/priorities/environment/publications/the-mayors-waste-management-strategies

Climate Change and Energy

London Mayor’s climate change adaptation strategy and climate change mitigation and energy strategy for London.
http://www.london.gov.uk/priorities/environment/publications/managing-risks-and-increasing-resilience-the-mayor-s-climate

http://www.london.gov.uk/priorities/environment/publications/delivering-londons-energy-future-the-mayors-climate-change-mitigation-and-energy-strategy

London Plan

The spatial development strategy for London setting out a fully integrated economic, environmental, transport and social framework for the development of the capital to 2031.
http://www.london.gov.uk/priorities/planning/london-plan

Upper Lee Valley Opportunity Area Planning Framework (ULVOAF)

Framework for the regeneration of the Upper Lee Valley, Supplementary Planning Guidance to the London Plan and will be used as a material consideration in the determination of planning applications.
https://www.london.gov.uk/priorities/planning/opportunity-areas/upper-lee-valley-opportunity-area-planning-framework-0

Enfield Local Plan

Set of planning policies that are used to determine planning applications in Enfield.
http://www.enfield.gov.uk/info/1000000456/local_plan_planning_policy

Central Leeside Area Action Plan

Provides the specific planning allocations and designations for the Central Leeside area, which includes the Edmonton EcoPark site.
http://www.enfield.gov.uk/info/1000000456/local_plan_planning_policy/501/central_leeside__area_action_plan

Edmonton EcoPark Planning Brief Supplementary Planning Document (SPD)

A supplementary Planning Document to Enfield’s Local Plan. The Planning Brief provides guidance on the future development of the EcoPark.
http://www.enfield.gov.uk/info/1000000664/edmonton_regeneration/2249/edmonton_ecopark_planning_brief_supplementary_planning_document_spd

primage
 
NLWA thanks public and organisations for feedback on replacement waste facility
21 July 2015

NLWA has thanked the public and organisations for giving feedback on their proposals as part of the public consultation for the North London Heat and Power Project.

Read more