Hello! Our two planned phases of consultation have now finished. We have reviewed all of the feedback we received during both phases of the consultation and have produced a summary of the consultation report.

Close ×

If you have any questions please call 0208 489 3940 or email info@northlondonheatandpower.london

Close

×

Appendices Figures

Vol 1 Figure 2.1 Application Site Boundary and Site Context
Vol 1 Figure 2.2 Environmental Designations
Vol 1 Figure 3.1 Detailed Site Layout
Vol 1 Figure 3.2 Phasing Plan - Phase 1a
Vol 1 Figure 3.3 Phasing Plan - Phase 1b
Vol 1 Figure 3.4 Phasing Plan - Phase 1c
Vol 1 Figure 3.5 Phasing Plan - Phase 1d
Vol 1 Figure 3.6 Phasing Plan - Phase 2
Vol 1 Figure 3.7 Phasing Plan - Phase 3
Vol 1 Figure 3.8 Phasing Plan - Phase 4
Vol 1 Figure 5.1 Cumulative Development Location Plan

Vol 2 Figure 2.1 AQMA
Vol 2 Figure 2.2 Monitoring Locations
Vol 2 Figure 2.3 Arup Monitoring Locations
Vol 2 Figure 2.4 Odour Complaints
Vol 2 Figure 2.5 Construction Dust Buffers
Vol 2 Figure 2.6 Receptor Locations
Vol 2 Figure 2.7 Model Output Grid
Vol 2 Figure 2.8 Ecological Receptors
Vol 2 Figure 2.9 Human Health Receptors
Vol 2 Figure 2.10 Wind Rose
Vol 2 Figure 2.11 Modelled Buildings
Vol 2 Figure 2.12 Existing EfW NO2
Vol 2 Figure 2.13 Existing EfW PM10
Vol 2 Figure 2.14 ERF Wet FGT NO2
Vol 2 Figure 2.15 ERF Wet FGT PM10
Vol 2 Figure 2.16 ERF Wet with reheat FGT NO2
Vol 2 Figure 2.17 ERF Wet with reheat FGT PM10
Vol 2 Figure 6.1 Borehole Plan
Vol 2 Figure 6.2 Section A-A
Vol 2 Figure 6.3 Section B-B
Vol 2 Figure 6.4 Source Protection Zone
Vol 2 Figure 6.5 London Clay Thickness
Vol 2 Figure 7.1 Noise Measurement and Receptor Locations
Vol 2 Figure 7.2 Traffic Routes for NLHPP
Vol 2 Figure 8.1 Neighbourhood Area
Vol 2 Figure 8.2 Deprivation in Neighbourhood
Vol 2 Figure 9.1 Local Highway Network
Vol 2 Figure 9.2 Local Transport Context
Vol 2 Figure 10.1 Hydrology
Vol 2 Figure 10.2 Abstractions and Discharges